GRACO G-Chem Pump, HNBR Seal, 3/8 in Plunger, 115 VAC, 1/6 HP, Simplex - (SKU: A23508)

GRACO G-Chem Pump, HNBR Seal, 3/8 in Plunger, 115 VAC, 1/6 HP, Simplex - (SKU: A23508)

SKU: A23508

In stock

Shipping calculated at checkout.
Skip to product information
1 of 1

Collaborating with the Best in the Industry

GRACO G-Chem Pump, HNBR Seal, 3/8 in Plunger, 115 VAC, 1/6 HP, Simplex - (SKU: A23508)

GRACO G-Chem Pump, HNBR Seal, 3/8 in Plunger, 115 VAC, 1/6 HP, Simplex - (SKU: A23508)

SKU: A23508

Shipping calculated at checkout.
atc icon
For precise shipping dates, please contact us.

The GRACO G-Chem Pump with HNBR Seal and 3/8 in plunger is a chemical injection pump designed for reliable, low-maintenance operation. It features a robust construction with HNBR (Hydrogenated Nitrile Butadiene Rubber) seals and is intended for use in chemical injection applications, ensuring precise and consistent delivery of chemicals within industrial systems.

Key Features:

  • Chemical Injection Pump
  • Simplex, 3/8 in Plunger
  • Stainless steel wetted parts, HNBR seals, UHMWPE and PTFE packing materials
  • Designed for integration with GRACO chemical injection systems and compatible with various chemical fluids (see manual for chemical compatibility)
  • Easy access to pump plunger and packings
  • Plunger packings can be replaced in 10 minutes or less
  • Three defined stroke adjustment positions
  • Adjustable fluid packing for longer seal life
  • Proprietary poppet style check valve to prevent sticking
  • Robust and simple design for reliability and ease of maintenance
  • Suitable for ordinary location environmental temperature range: -40° to 131°F (-40° to 55°C)
  • Maximum sound pressure <70 dBa

Applications:
Ideal for chemical injection in industrial, mining, agricultural, and manufacturing environments where precise and reliable chemical dosing is required.

Installation Notes:

  • Using genuine GRACO parts ensures optimal performance, reliability, and safety of the chemical injection system.
  • Verify all system valves are open before priming the pump to avoid equipment damage
  • Follow electrical connection instructions as per the manual (115 VAC input for this model)
  • Mount securely using provided mounting holes
  • Refer to the manual for specific installation and maintenance procedures
  • Adjust cycle rate and/or stroke as needed to achieve desired flow rate
  • Regularly inspect and replace plunger packings as needed
  • Ensure seals and wetted parts are compatible with the chemicals being injected
  • Keep the pump clean and free from debris
  • Consult the manual for detailed maintenance schedules and procedures

Collaborating with the Best in the Industry

View full details

Unmatched performance & Expert support

Unmatched Durability and Reliability Unmatched Durability and Reliability

Unmatched Durability and Reliability

Engineered for lasting, heavy-duty performance.

Personalized Setup and Installation Support Personalized Setup and Installation Support

Personalized Setup and Installation Support

Expert guidance for correct setup and optimal performance from day one.

Comprehensive Maintenance Services Comprehensive Maintenance Services

Comprehensive Maintenance Services

Preventative maintenance ensures peak performance and longevity of your equipment.

Fast and Reliable Replacement Parts Fast and Reliable Replacement Parts

Fast and Reliable Replacement Parts

Quick shipping of genuine parts to minimize downtime and repair delays.

Expert 1
Expert 2
Meet our experts

Let's talk about what you need!

Our team is excited to help you!

16815 117 Avenue NW, Unit #110, Edmonton, AB T5M 3V6

info@innoflo.com

(780) 944-4819

View on Map

Our team is excited to help you!