GRACO ToughTek SL340e Self-Leveling Floor Topping Pump Package, 120V - (SKU: 25B510)

GRACO ToughTek SL340e Self-Leveling Floor Topping Pump Package, 120V - (SKU: 25B510)

SKU: 25B510

En stock

Frais d'expédition calculés à l'étape de paiement.
Passer aux informations produits
1 de 1

Collaborating with the Best in the Industry

GRACO ToughTek SL340e Self-Leveling Floor Topping Pump Package, 120V - (SKU: 25B510)

GRACO ToughTek SL340e Self-Leveling Floor Topping Pump Package, 120V - (SKU: 25B510)

SKU: 25B510

Frais d'expédition calculés à l'étape de paiement.
atc icon
For precise shipping dates, please contact us.

The GRACO 25B510 ToughTek SL340e is a self-leveling floor topping pump package designed for efficient placement of heavy mix materials such as self-leveling underlayments and toppings. It features a heavy-duty steel construction for durability and is intended to eliminate the need to move mixers around the jobsite, allowing material to be pumped directly to the work area via hose.

Key Features:

  • Self-leveling floor topping pump package
  • SL340e
  • Heavy-duty steel
  • Designed for use with standard barrel mixers and heavy mix materials
  • Quick-access piston pump for easy maintenance
  • MaxPower DC brushless motor for high torque and no maintenance
  • Compact and portable (210 lb)
  • Adjustable material flow control
  • Low profile 30-gallon steel hopper
  • No-tools hopper removal for easy cleaning and transport
  • Convenient 120V power (plugs into standard wall outlet)

Applications:
Ideal for pumping self-leveling underlayments, toppings, and other heavy mix materials in commercial and industrial flooring applications.

Installation Notes:

  • Using genuine GRACO parts ensures optimal performance, reliability, and safety. Non-genuine parts may void warranties and reduce equipment lifespan.
  • Position the pump and mixer in a central location to maximize hose reach and minimize material handling
  • Ensure the pump is on a stable, level surface before operation
  • Connect to a standard 120V wall outlet; no electrician or rewiring required
  • Regularly clean the hopper and pump components to prevent material buildup and ensure trouble-free operation
  • Refer to the equipment manual for detailed setup and maintenance instructions

Collaborating with the Best in the Industry

Afficher tous les détails

Unmatched performance & Expert support

Unmatched Durability and Reliability Unmatched Durability and Reliability

Unmatched Durability and Reliability

Engineered for lasting, heavy-duty performance.

Personalized Setup and Installation Support Personalized Setup and Installation Support

Personalized Setup and Installation Support

Expert guidance for correct setup and optimal performance from day one.

Comprehensive Maintenance Services Comprehensive Maintenance Services

Comprehensive Maintenance Services

Preventative maintenance ensures peak performance and longevity of your equipment.

Fast and Reliable Replacement Parts Fast and Reliable Replacement Parts

Fast and Reliable Replacement Parts

Quick shipping of genuine parts to minimize downtime and repair delays.

Expert 1
Expert 2
Meet our experts

Let's talk about what you need!

Our team is excited to help you!

16815 117 Avenue NW, Unit #110, Edmonton, AB T5M 3V6

info@innoflo.com

(780) 944-4819

View on Map

Our team is excited to help you!